leogLand

Case study

The goal of the Legoland Waterpark Cabling Expansion Project was to enhance the visitor experience in the park and improve safety within the facility.

Embee integrated and installed two 25-pair Cat 5e cables and two 25-pair OSP cables with thirteen access points 1-data Cat5e outlets.

Challenge
Customers complained about inadequate BYOD coverage in the park. Patrons that were separated from their families on site were having difficulty reconnecting with their loved ones
Solution
Embee performed a heat map survey to identify problem areas. After analyzing visitor populations during specific times of the day, we designed a WiFi architecture that would not only solve the existing problem but anticipate future visitor increases.